• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Industrial Standards
  • API - American Petroleum Institute
  • View Item
  •   YSE
  • Industrial Standards
  • API - American Petroleum Institute
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

API TR 6MET

Metallic Material Limits for Wellhead Equipment Used in High Temperature for API 6A and 17D Applications - First Edition

Organization:
API - American Petroleum Institute
Year: 2010

Abstract: Testing was performed in three phases, presented herein in chronological order as Phase I, II, and III. Initially, all testing was to be completed in two phases, but testing anomalies in Phase II prompted re-testing of some alloys in Phase III.
Alloy candidates were recommended by AWHEM membership for analysis and confirmed by API's approval of New Work Item No. 2003-100786 in June 2002. Several material suppliers and several AWHEM member companies donated material for testing. Metallurgists on the Task Group screened material certificates to ensure a "normal" chemistry without enhancements for the material candidates listed.
Alloy chemistries from the material certificates for each of the supplied alloy candidates are provided in Table 6 through Table 16, located at the end of this report for readability.
URI: http://mapnamagz.yabesh.ir/std;query=authoF23793FD081DAC4/handle/yse/192373
Collections :
  • API - American Petroleum Institute
  • Download PDF : (1.921Mb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    API TR 6MET

Show full item record

contributor authorAPI - American Petroleum Institute
date accessioned2017-09-04T18:09:20Z
date available2017-09-04T18:09:20Z
date copyright2010.10.01
date issued2010
identifier otherGUHFBDAAAAAAAAAA.pdf
identifier urihttp://mapnamagz.yabesh.ir/std;query=authoF23793FD081DAC4/handle/yse/192373
description abstractTesting was performed in three phases, presented herein in chronological order as Phase I, II, and III. Initially, all testing was to be completed in two phases, but testing anomalies in Phase II prompted re-testing of some alloys in Phase III.
Alloy candidates were recommended by AWHEM membership for analysis and confirmed by API's approval of New Work Item No. 2003-100786 in June 2002. Several material suppliers and several AWHEM member companies donated material for testing. Metallurgists on the Task Group screened material certificates to ensure a "normal" chemistry without enhancements for the material candidates listed.
Alloy chemistries from the material certificates for each of the supplied alloy candidates are provided in Table 6 through Table 16, located at the end of this report for readability.
languageEnglish
titleAPI TR 6METnum
titleMetallic Material Limits for Wellhead Equipment Used in High Temperature for API 6A and 17D Applications - First Editionen
typestandard
page46
statusActive
treeAPI - American Petroleum Institute:;2010
contenttypefulltext
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian