• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Industrial Standards
  • ASHRAE - American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc.
  • View Item
  •   YSE
  • Industrial Standards
  • ASHRAE - American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc.
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

ASHRAE LO-09-071

Improving Control and Operation of a Single Duct VAV System through CCLEP

Organization:
ASHRAE - American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc.
Year: 2009

Abstract: INTRODUCTION
With the energy crisis of the early 1970s came the realization that buildings could be made much more efficient without sacrificing comfort. Over the last 30 years, use of variable air volume systems has become common practice. Many variable air volume (VAV) systems with pneumatic controls were installed in the 1980s and are still in use. However, these systems often have outdated control strategies and deficient mechanical systems are deficient, which may cause occupant discomfort and excess energy consumption.
An ASHRAE committee proposed building commissioning in 1988 to ensure that system performance met design specifications. Continuous Commissioning (CC®) technology was developed and implemented in 1992. CC is an ongoing process to resolve operating problems, improve comfort, optimize energy use and identify retrofits for existing commercial and institutional buildings and central plant facilities [1-5]. Since 1999, the Energy Systems Laboratory (ESL) at the University of Nebraska has conducted extensive research to implement optimal system control during the design phase and finalize the optimal setpoints after system installation. ESL researchers have developed and implemented the Continuous Commissioning Leading Energy Project (CCLEP) process with federal and industry support. The CCLEP process has two stages: the contracting stage and the implementation stage. During the contracting stage, a comprehensive technical evaluation is performed. The CCLEP implementation stage involves planning, retrofit and trouble shooting, and optimization and follow-up. The CCLEP process, procedures and seven case study results are presented in [6].
This paper presents information on the case study facility, existing and improved control sequences, and building performance improvement and energy consumption measures before and after CCLEP implementation.
URI: http://mapnamagz.yabesh.ir/std;query=autho4A5893/handle/yse/212580
Collections :
  • ASHRAE - American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc.
  • Download PDF : (561.1Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    ASHRAE LO-09-071

Show full item record

contributor authorASHRAE - American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc.
date accessioned2017-09-04T18:30:19Z
date available2017-09-04T18:30:19Z
date copyright01/01/2009
date issued2009
identifier otherIVYXPCAAAAAAAAAA.pdf
identifier urihttp://mapnamagz.yabesh.ir/std;query=autho4A5893/handle/yse/212580
description abstractINTRODUCTION
With the energy crisis of the early 1970s came the realization that buildings could be made much more efficient without sacrificing comfort. Over the last 30 years, use of variable air volume systems has become common practice. Many variable air volume (VAV) systems with pneumatic controls were installed in the 1980s and are still in use. However, these systems often have outdated control strategies and deficient mechanical systems are deficient, which may cause occupant discomfort and excess energy consumption.
An ASHRAE committee proposed building commissioning in 1988 to ensure that system performance met design specifications. Continuous Commissioning (CC®) technology was developed and implemented in 1992. CC is an ongoing process to resolve operating problems, improve comfort, optimize energy use and identify retrofits for existing commercial and institutional buildings and central plant facilities [1-5]. Since 1999, the Energy Systems Laboratory (ESL) at the University of Nebraska has conducted extensive research to implement optimal system control during the design phase and finalize the optimal setpoints after system installation. ESL researchers have developed and implemented the Continuous Commissioning Leading Energy Project (CCLEP) process with federal and industry support. The CCLEP process has two stages: the contracting stage and the implementation stage. During the contracting stage, a comprehensive technical evaluation is performed. The CCLEP implementation stage involves planning, retrofit and trouble shooting, and optimization and follow-up. The CCLEP process, procedures and seven case study results are presented in [6].
This paper presents information on the case study facility, existing and improved control sequences, and building performance improvement and energy consumption measures before and after CCLEP implementation.
languageEnglish
titleASHRAE LO-09-071num
titleImproving Control and Operation of a Single Duct VAV System through CCLEPen
typestandard
page9
statusActive
treeASHRAE - American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc.:;2009
contenttypefulltext
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian