MIL-STD-2042-6B
FIBER OPTIC CABLE TOPOLOGY INSTALLATION STANDARD METHODS FOR NAVAL SHIPS (TESTS) (PART 6 OF 7 PARTS)
Organization:
NAVY - SH - Naval Sea Systems Command (Ship Systems)
Year: 2002
Abstract: This standard practice provides detailed methods for testing optical fiber cable installations.
These criteria apply to installations on specific ships when invoked by the governing ship specification or other contractual document. They are intended primarily for new construction; however, they are also applicable for conversion or alteration of existing ships. Where there is a conflict between this document and the ship specification or contract, the ship specification or contract shall take precedence. Where ship design is such that the methods herein cannot be implemented, users shall submit new methods or modifications to existing methods for approval prior to implementation to: Department of the Navy, Naval Surface Warfare Center, Dahlgren Division, ATTN: Code B35, 17320 Dahlgren Road, Dahlgren, VA 22448-5100. Intended Use: The methods for testing depicted in this standard practice are intended to ensure the FOCT is properly installed during and after each phase of installation procedures.
These criteria apply to installations on specific ships when invoked by the governing ship specification or other contractual document. They are intended primarily for new construction; however, they are also applicable for conversion or alteration of existing ships. Where there is a conflict between this document and the ship specification or contract, the ship specification or contract shall take precedence. Where ship design is such that the methods herein cannot be implemented, users shall submit new methods or modifications to existing methods for approval prior to implementation to: Department of the Navy, Naval Surface Warfare Center, Dahlgren Division, ATTN: Code B35, 17320 Dahlgren Road, Dahlgren, VA 22448-5100. Intended Use: The methods for testing depicted in this standard practice are intended to ensure the FOCT is properly installed during and after each phase of installation procedures.
Subject: Acceptance tests
Collections
:
-
Statistics
MIL-STD-2042-6B
Show full item record
| contributor author | NAVY - SH - Naval Sea Systems Command (Ship Systems) | |
| date accessioned | 2017-09-04T18:00:36Z | |
| date available | 2017-09-04T18:00:36Z | |
| date copyright | 07/25/2002 | |
| date issued | 2002 | |
| identifier other | FXEFABAAAAAAAAAA.pdf | |
| identifier uri | http://mapnamagz.yabesh.ir/std;query=autho1826AF67FCdardstandardsfen/handle/yse/183653 | |
| description abstract | This standard practice provides detailed methods for testing optical fiber cable installations. These criteria apply to installations on specific ships when invoked by the governing ship specification or other contractual document. They are intended primarily for new construction; however, they are also applicable for conversion or alteration of existing ships. Where there is a conflict between this document and the ship specification or contract, the ship specification or contract shall take precedence. Where ship design is such that the methods herein cannot be implemented, users shall submit new methods or modifications to existing methods for approval prior to implementation to: Department of the Navy, Naval Surface Warfare Center, Dahlgren Division, ATTN: Code B35, 17320 Dahlgren Road, Dahlgren, VA 22448-5100. Intended Use: The methods for testing depicted in this standard practice are intended to ensure the FOCT is properly installed during and after each phase of installation procedures. | |
| language | English | |
| title | MIL-STD-2042-6B | num |
| title | FIBER OPTIC CABLE TOPOLOGY INSTALLATION STANDARD METHODS FOR NAVAL SHIPS (TESTS) (PART 6 OF 7 PARTS) | en |
| type | standard | |
| page | 74 | |
| status | Active | |
| tree | NAVY - SH - Naval Sea Systems Command (Ship Systems):;2002 | |
| contenttype | fulltext | |
| subject keywords | Acceptance tests | |
| subject keywords | Assembly link loss test | |
| subject keywords | Attenuation test | |
| subject keywords | Continuity test | |
| subject keywords | End-to-end attenuation test | |
| subject keywords | Installation tests | |
| subject keywords | Measurement quality jumpers | |
| subject keywords | Post-installation tests | |
| subject keywords | Pre-installation tests | |
| subject keywords | Safety procedures | |
| subject keywords | Visual inspections |

درباره ما