• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • USCG - United States Coast Guard
  • View Item
  •   YSE
  • Defence Standards
  • USCG - United States Coast Guard
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

COMDTINST M5000.11B

NON-MAJOR ACQUISITION PROCESS (NMAP) MANUAL

Organization:
USCG - United States Coast Guard
Year: 2012

Abstract: PURPOSE. To define a structured, disciplined process for the designation, management, and oversight of Non-Major Acquisitions. Non-Major Acquisitions are those investments that are below the threshold for Level 1 or 2 investments as defined in references (a) and (b) and are relatively high visibility, high risk, complex, essential to mission execution, or require significant integration. These investments warrant a disciplined project management process to include oversight through formal milestone reviews. This manual has been tailored in response to the requirements in references (b) through (h). Exclusions: this Manual provides acquisition procedures for projects other than facilities/construction and service contracts.
URI: http://mapnamagz.yabesh.ir/std;query=autho1826AF67FCdardstandardsfen/handle/yse/13966
Collections :
  • USCG - United States Coast Guard
  • Download PDF : (1.406Mb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    COMDTINST M5000.11B

Show full item record

contributor authorUSCG - United States Coast Guard
date accessioned2017-09-04T15:15:03Z
date available2017-09-04T15:15:03Z
date copyright41274
date issued2012
identifier otherMFEVBFAAAAAAAAAA.pdf
identifier urihttp://mapnamagz.yabesh.ir/std;query=autho1826AF67FCdardstandardsfen/handle/yse/13966
description abstractPURPOSE. To define a structured, disciplined process for the designation, management, and oversight of Non-Major Acquisitions. Non-Major Acquisitions are those investments that are below the threshold for Level 1 or 2 investments as defined in references (a) and (b) and are relatively high visibility, high risk, complex, essential to mission execution, or require significant integration. These investments warrant a disciplined project management process to include oversight through formal milestone reviews. This manual has been tailored in response to the requirements in references (b) through (h). Exclusions: this Manual provides acquisition procedures for projects other than facilities/construction and service contracts.
languageEnglish
titleCOMDTINST M5000.11Bnum
titleNON-MAJOR ACQUISITION PROCESS (NMAP) MANUALen
typestandard
page114
statusActive
treeUSCG - United States Coast Guard:;2012
contenttypefulltext
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian