• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Industrial Standards
  • ACI - American Concrete Institute
  • View Item
  •   YSE
  • Industrial Standards
  • ACI - American Concrete Institute
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

ACI 325.11R

Accelerated Techniques for Concrete Paving

Organization:
ACI - American Concrete Institute
Year: 2001

Abstract: General
Airport authorities and road agencies face major challenges from increasing traffic volumes on existing airports, roadways, and urban streets. Owners must repair or replace deteriorated pavements while maintaining traffic on these structures. Traditional pavement construction, repair, or replacement solutions may no longer be universally acceptable due to increasing public impatience with traffic interruption. Traditional solutions are especially inappropriate in urban areas where congestion is severe. Accelerated construction techniques for portland cement concrete pavement resolve these problems by providing quick public access to a highquality, long-lasting pavement. Accelerated construction techniques are suitable for new construction, reconstruction, or resurfacing projects. Accelerated construction for concrete paving is often referred to as "fast-track" concrete paving. Accelerated paving encompasses two classes of activities: technological methods to accelerate the rate of strength gain and contractual methods to minimize the construction time.
Many methods exist to accelerate pavement construction. Two traditional acceleration methods are time incentives and penalties for project completion. Agencies have been using these time-of-completion incentives for many years, and often contractors will meet these requirements by lengthening the work day or increasing the size of construction crews. Using accelerated paving techniques, a contractor often can complete a project without increasing crew size or changing normal labor schedules.
URI: http://mapnamagz.yabesh.ir/std;query=autho1826AF67FCdardstandardsfen/handle/yse/102856
Subject: accelerated paving
Collections :
  • ACI - American Concrete Institute
  • Download PDF : (753.7Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    ACI 325.11R

Show full item record

contributor authorACI - American Concrete Institute
date accessioned2017-09-04T16:39:12Z
date available2017-09-04T16:39:12Z
date copyright01/01/2001
date issued2001
identifier otherBRLNPAAAAAAAAAAA.pdf
identifier urihttp://mapnamagz.yabesh.ir/std;query=autho1826AF67FCdardstandardsfen/handle/yse/102856
description abstractGeneral
Airport authorities and road agencies face major challenges from increasing traffic volumes on existing airports, roadways, and urban streets. Owners must repair or replace deteriorated pavements while maintaining traffic on these structures. Traditional pavement construction, repair, or replacement solutions may no longer be universally acceptable due to increasing public impatience with traffic interruption. Traditional solutions are especially inappropriate in urban areas where congestion is severe. Accelerated construction techniques for portland cement concrete pavement resolve these problems by providing quick public access to a highquality, long-lasting pavement. Accelerated construction techniques are suitable for new construction, reconstruction, or resurfacing projects. Accelerated construction for concrete paving is often referred to as "fast-track" concrete paving. Accelerated paving encompasses two classes of activities: technological methods to accelerate the rate of strength gain and contractual methods to minimize the construction time.
Many methods exist to accelerate pavement construction. Two traditional acceleration methods are time incentives and penalties for project completion. Agencies have been using these time-of-completion incentives for many years, and often contractors will meet these requirements by lengthening the work day or increasing the size of construction crews. Using accelerated paving techniques, a contractor often can complete a project without increasing crew size or changing normal labor schedules.
languageEnglish
titleACI 325.11Rnum
titleAccelerated Techniques for Concrete Pavingen
typestandard
page18
statusActive
treeACI - American Concrete Institute:;2001
contenttypefulltext
subject keywordsaccelerated paving
subject keywordsadmixtures
subject keywordsaggregates
subject keywordsairports
subject keywordscement
subject keywordsconcrete pavement
subject keywordsconstruction
subject keywordscuring
subject keywordsfast-track paving
subject keywordsgradation
subject keywordshighways
subject keywordsintersections
subject keywordsjoint sealing compound
subject keywordsjointing
subject keywordsnondestructive strength testing
subject keywordsopening-to-traffic
subject keywordsspecifications
subject keywordsstreets
subject keywordstemperature
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian