• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • MSFC - NASA - MSFC - Marshall Space Flight Center
  • View Item
  •   YSE
  • Defence Standards
  • MSFC - NASA - MSFC - Marshall Space Flight Center
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

MSFC-PLAN-2731 REV B CHG NOTICE 2

X-34 & MC-1 ENGINE PROJECTS' CONFIGURATION MANAGEMENT PLAN

Organization:
MSFC - NASA - MSFC - Marshall Space Flight Center
Year: 2001

Abstract: INTRODUCTION
The X-34 and MC-1 Engine Projects Configuration Management (CM) Plan defines requirements, responsibilities, and procedures for the CM system applicable to the X-34 and MC-1 Engine project activities. This plan provides a systematic method to implement policies and requirements of MWI 8040.1, "Configuration Management Plan, Marshall Space Flight Center (MSFC) Programs/Projects." Implementation of this plan satisfies the intent of CM policies and requirements.
The scope of this plan includes hardware and software development, its integration into the X-34 Vehicle, other support hardware, and test facilities. The requirements and responsibilities apply to the X-34 and MC-l Engine contractors, MSFC, and other government/NASA facilities directly involved in the X-34 and MC-1 Engine Projects.
The plan\'s purpose is to implement a CM system which will meet the following objectives:
a. Identify and document the technical requirements of all Configuration Items (CI) and Computer Software Configuration Items (CSCI).
b. Control changes/deviations/waivers to these technical requirements.
c. Control interfaces among the CIs and CSCIs.
d. Verify performance, design, and configuration through design reviews.
e. Provide project management identification and baseline information for technical, cost and schedule.
URI: http://mapnamagz.yabesh.ir/std/handle/yse/108943
Collections :
  • MSFC - NASA - MSFC - Marshall Space Flight Center
  • Download PDF : (1.768Mb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    MSFC-PLAN-2731 REV B CHG NOTICE 2

Show full item record

contributor authorMSFC - NASA - MSFC - Marshall Space Flight Center
date accessioned2017-09-04T16:45:38Z
date available2017-09-04T16:45:38Z
date copyright2001.01.11
date issued2001
identifier otherWAEEIBAAAAAAAAAA.pdf
identifier urihttp://mapnamagz.yabesh.ir/std/handle/yse/108943
description abstractINTRODUCTION
The X-34 and MC-1 Engine Projects Configuration Management (CM) Plan defines requirements, responsibilities, and procedures for the CM system applicable to the X-34 and MC-1 Engine project activities. This plan provides a systematic method to implement policies and requirements of MWI 8040.1, "Configuration Management Plan, Marshall Space Flight Center (MSFC) Programs/Projects." Implementation of this plan satisfies the intent of CM policies and requirements.
The scope of this plan includes hardware and software development, its integration into the X-34 Vehicle, other support hardware, and test facilities. The requirements and responsibilities apply to the X-34 and MC-l Engine contractors, MSFC, and other government/NASA facilities directly involved in the X-34 and MC-1 Engine Projects.
The plan\'s purpose is to implement a CM system which will meet the following objectives:
a. Identify and document the technical requirements of all Configuration Items (CI) and Computer Software Configuration Items (CSCI).
b. Control changes/deviations/waivers to these technical requirements.
c. Control interfaces among the CIs and CSCIs.
d. Verify performance, design, and configuration through design reviews.
e. Provide project management identification and baseline information for technical, cost and schedule.
languageEnglish
titleMSFC-PLAN-2731 REV B CHG NOTICE 2num
titleX-34 & MC-1 ENGINE PROJECTS' CONFIGURATION MANAGEMENT PLANen
typestandard
page34
statusActive
treeMSFC - NASA - MSFC - Marshall Space Flight Center:;2001
contenttypefulltext
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian