Show simple item record

Nato Users Guide to EMP Testing and Simulation - ED 1

contributor authorNATO - North Atlantic Treaty Organization
date accessioned2017-09-04T17:29:53Z
date available2017-09-04T17:29:53Z
date copyright07/01/1988
date issued1988
identifier otherCTOZJAAAAAAAAAAA.pdf
identifier urihttp://mapnamagz.yabesh.ir/std;query=autho1826AF67FCdardstandardsfen/handle/yse/152981
description abstractAllied Engineering Publication (AEP) -18 is a reference document for system developers. It is expressly written for those system developers who are unfamiliar with the many nuances of EMP testing but are nevertheless responsible for developing systems which must survive the EMP environment described in AEP-4.
The document is noticeably different from other EMP reference documents in both organization and format. It is divided into two parts, Part I for system managers and Part II for system engineers. Though each is meant to stand alone, together they form the steps required to properly plan, execute, and document a system level verification and acceptance test program. The format is also unique, providing space on each page for note-taking. And finally, releveant reference documents are provided at the end of each chapter for those readers intrerested in more details.
Probably the single most important piece of information given the system manager in Part I is a detailed test milestone flowchart, a simplified version of which is given in figure ES-1. It is essentially the roadmap for developing/executing a successful EMP verification and acceptance test at the EMP facilities described in AEP-9, volume 5.
In addition to the detailed test milestone flowchart, Part I identifies a technique for selecting the proper test facilities for a given system type. This selection technique is summarized in figure ES-2. It should be noted that the selection technique is based on an ideal situation where all types of simulation and test methods are available. This may not always be the case, and choice may be limited by the availability of resources. In this case, the system manager should consult his national EMP point of contact to determine the best available option.
languageEnglish
titleNATO AEP-18num
titleNato Users Guide to EMP Testing and Simulation - ED 1en
typestandard
page220
statusActive
treeNATO - North Atlantic Treaty Organization:;1988
contenttypefulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record